EasyManua.ls Logo

Culligan High Efficiency 1.5 - Page 34

Culligan High Efficiency 1.5
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30 Culligan® High Efficiency 1.5 Water Softener
30 Cat. No. 01023552
IMPORTANT—Setting the Jumpers for Progressive Flow
For progressive flow to operate properly, the first and last units must have
the jumpers set to pins 1 and 2 on terminal J22 (see Figure 38 at right).
All middle units should have the jumpers on pins 2 and 3. The diagrams
below (Figure 39 and Figure 40) show duplex connections. Repeat the
connections on any additional systems.
Communication Cable 01024362 to
Additional Units (if necessary)
Communication Cable 01024360
Jumper
Location
Flow Meter Flow Meter
Unit 1 Unit 2
Wiring for EXTERNALLY
BLOCKED Progressive
Flow Solenoids
NOTE: These solenoids are NOT used for
internally blocked progressive flow
An auxiliary board (P/N 01020748) is
required for EXTERNALLY BLOCKED
progressive flow systems ONLY. One
auxiliary board per valve—must be
purchased separately.
PHONE
24v
2.5v
PHONE
24v
2.5v
Figure 39. Duplex connections.
RS 485 Comm Port
CABLE 01024360
To RS 485 Comm Port
on GBE Circuit Board, #2
PARALLEL
Additional communication cable
connections are used when there
are three or more controls. Connect
end of second (01024360) cable
to this connector and other end of
cable to RS 485 Comm Port on third
GBE Circuit Board.
Figure 40. Parallel cable for Smart Controller.
Jumper location for
first and last units
(end units).
Jumper location for
middle units.
1 2 3
Figure 38.

Related product manuals