3 Position the urn on the countertop. Level it left to right
and front to back by turning the feet at the bottom of
the legs.
Installation
Prepare the Location
1 Determine the location. Make sure that the counter is
capable of supporting at least 600 lbs. to allow for the
urn weight at full capacity.
INSTALLATION INSTRUCTIONS II7
WARNING: Use the leveling legs to level the urn
only. Do not use them to adjust the urn height.
Do not extend them higher than necessary.
WARNING: DO NOT place the urn closer than
6 inches from the wall. The urn must have
adequate cross-ventilation.
Level the Unit
2 Remove the urn from the shipping carton and install
UIFMFHTPOUIFDPSOFST4DSFXUIFNmSNMZJOUPQMBDF
on the bottom of the unit.
36"650."5*$*/45"--"5*0/*/4536$5*0/4ø "
Install the Faucets
4 Install the faucets on the front of the unit. Be careful
not to over tighten the faucet mounting nuts.