13. Relocating the mobile scaffold tower
Procedure for relocating the mobile scaffold tower:
Check the environment for obstacles that may be around the route that the mobile
scaffold tower will follow. Make sure the surface is clean, check the route on
potholes / unevenness / cables / irregularities / traffic / passers-by.
Reduce the height to 6,3 m platform height maximum
The maximal permitted slope is 1% ((1% = a maximum of 1 cm inclination
measured per 1 metre)
In the event of wind forces larger than 4 Beaufort the scaffold may no longer be
relocated (4 Beaufort: dust, sand and paper will be blown up, small branches will
be torn off; the wind speed is 5.5 – 7.9 m/s = ±20 - 28 km/h).
Do not move the tower with people or materials on it
For stability reasons it is strongly advised to roll lengthways by hand from the
ground and do not exceed normal walking speed