EasyManua.ls Logo

CUSTERS CR 700 - Assembling the Narrow Mobile Scaffold Tower (3,5,7,9,11 m)

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Assembling the narrow mobile scaffold tower
(3,5,7,9,11 m)
1: Insert both casters into the 8-rung
frame; and make sure that the
casters are properly secured;
2: Place the horizontal braces on the
uprights of the frame;
3: Insert both casters into the 8-rung
frame; and make sure that the
casters are properly secured;
4: Place the horizontal braces on the
uprights of the frame;
5: Place the horizontal/diagonal brace on
the uprights of the frame;
6: Place the (temporary) platform (on the
5
th
rung from the top); slide both
blow-away protections under the rung;
Temporary
platform
1
2
3
4
5
6

Other manuals for CUSTERS CR 700