9
There must always be at least 1 platform with hatch on the working level; the working
level must be fitted with: guardrail, knee railing and toe boards all around. There must
always be at least one platform with a hatch on the resting level. The resting level
must be fitted all around with guardrails and knee railings and must be installed every
2 metres.
A resting level is converted into a working level through the installation of toe boards
all around.
Be aware that one level only shall be a working platform at one time.
It is to be taken into account that the correct platform height in relation to the
required work should be selected.
On a working platform a maximum of two persons are permitted.
The horizontal and diagonal braces have a self-locking claw. To unlock, just push the
coloured plastic part inwards and the brace can be removed.