EasyManua.ls Logo

Dahua Digital VTH - Preparation and Commissioning; 3.1 Preparation Steps; 3.1.1 VTO Configuration

Dahua Digital VTH
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
错误!使用开始”选项卡 Heading 1,l1,H1,Title1,Normal + Font: Helvetica,Bold,Space Before
12 pt,Not Bold,Heading One,h1,Head1,Head,1,Numbered,nu,Level 1 Head,1st level,Section He
ad,Sec1,h11,1st level1,h12,1st level2,h13,1st level3,h14,1st level4,h15,1st level5,h16,h17 6
2 Installation and Debugging
2.1 Installation
Don’t install VTH in bad environment, such as condensation, high temperature, stained,
dusty, chemically corrosive and direct sunshine environment.
In case of abnormality after power on, please pull out network cable and cut off power
supply at once. Power on after troubleshooting.
Engineering installation and debugging shall be done by professional teams. Please dont
dismantle or repair arbitrarily in case of device failure. Please contact after-sales
department.
It is suggested that installation height of device central point shall be 1.4cm1.6cm above
the ground.
2.1.1 Surface Installation
Directly install the device with a bracket onto a wall, which is suitable for all types of devices.
Take “VTH1550CHfor example.
Drill holes in the wall according to hole positions of the bracket.
Fix installation bracket directly onto the wall with screws.
Put the device into installation bracket from top down.
Figure 2-1