Loading...
11 | Commissioning
Installer reference guide
229
EPRA14~18D + ETVH/X16S18+23E
Daikin Altherma 3 H HT F
4P644737-1A – 2022.03
INFORMATION
When performing a space heating test run, the backup heater is NOT checked. To
check backup heater operation, perform the Backup heater 1 and Backup
heater 2 test (see "11.4.4Actuator test run"[4229]).
To perform an operation test run
Conditions: Make sure all operation is disabled. Go to [C]: Operation and turn off
Space heating/cooling and Tank operation.
1 Set the user permission level to Installer. See "To change
the user permission level"[4132].
2 Go to [A.1]: Commissioning > Operation test run.
3 Select a test from the list. Example: Heating.
4 Select OK to confirm.
Result: The test run starts. It stops automatically when ready
(±30min).
To stop the test run manually:
1 In the menu, go to Stop test run.
2 Select OK to confirm.
NOTICE
Manual stop. During the space heating test run the unit measures the temperature
increase. If you manually stop the test run:
- After 30min from start, the measurement will be successful.
- Before 30min from start, the measurement might be unsuccessful.
If the measurement is successful, the logic to activate the backup heater will use a
timeframe tuned to your system. If not, it will use the default timeframe (3minutes).
INFORMATION
If the outdoor temperature is outside the range of operation, the unit may NOT
operate or may NOT deliver the required capacity.
To monitor leaving water and tank temperatures
During test run, the correct operation of the unit can be checked by monitoring its
leaving water temperature (heating/cooling mode) and tank temperature
(domestic hot water mode).
To monitor the temperatures:
1 In the menu, go to Sensors.
2 Select the temperature information.
11.4.4 Actuator test run
Purpose
Perform an actuator test run to confirm the operation of the different actuators.
For example, when you select Pump, a test run of the pump will start.