EasyManua.ls Logo

Daikin F-Series - Removal of the Electrical Box

Daikin F-Series
355 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit SiBE12-713
292 Removal Procedure
1.2 Removal of the Electrical Box
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1. Disconnect the
connecting wires
Illustrations are for 3 room
model. (4MK(X)S-F models
have 4 ports)
1
Inside structure.
2
Disconnect the
connecting wires.
Connecting wires of the A, B,
C, D port
(1) - Black Power supply
(2) - White Power supply
(3) - Red Transmission
Power Supply wires
(L) - Black
(N) - White
Fasten the wires on the
terminal board with screws.

Table of Contents

Other manuals for Daikin F-Series

Related product manuals