EasyManua.ls Logo

Daikin FTKV50NRV16 - PCBs and Swing Motor Removal; Remove Control PCB

Daikin FTKV50NRV16
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PCBs / Swing Motor Si041257EC
8 Removal Procedure
4. PCBs / Swing Motor
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step Procedure Points
1. Remove the control PCB.
1 Remove the screw of
the terminal board.
2
3
4
5
Release the earth/
ground wire and the
indoor heat exchanger
thermistor lead wire
from the groove.
Pull out the control PCB
from the electrical box.
Disconnect the
connector for the
display/signal receiver
PCB ([CN_DB] or
[S26]).
Remove the control
PCB.
(R19790)
Terminal board
(R23396)
Control PCB
Groove
Indoor heat
exchanger
thermistor lead
wire
Earth/ground
wire
Connector for display/signal
receiver PCB

Related product manuals