SiUS041829E
124 Part 7 Trial Operation and Field Settings
1. Pump Down Operation............................................................................125
2. Forced Cooling Operation .......................................................................126
3. Trial Operation ........................................................................................127
4. Field Settings ..........................................................................................129
4.1 Temperature Display Switch .................................................................... 129
4.2 When 2 Units are Installed in 1 Room...................................................... 129
4.3 Jumper and Switch Settings..................................................................... 130
4.4 Facility Setting (cooling at low outdoor temperature) ............................... 131
5. Silicone Grease on Power Transistor/Diode Bridge................................132
Part 7
Trial Operation and
Field Settings