EasyManua.ls Logo

Daikin FTXS09LVJU User Manual

Daikin FTXS09LVJU
14 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DAIKIN ROOM AIR CONDITIONER
INSTALLATION MANUAL
R410A Split Series
EnglishFrançaisEspañol
MODELS
FTXS09LVJU
FTXS12LVJU
CTXS07LVJU
00_CV_3P297301-1.indd 1 10/18/2011 6:25:17 PM
Question and Answer IconNeed help?

Do you have a question about the Daikin FTXS09LVJU and is the answer not in the manual?

Daikin FTXS09LVJU Specifications

General IconGeneral
TypeSplit System
Cooling Capacity9, 000 BTU/h
HSPF9.0
RefrigerantR-410A
Sound Level19 dB(A)

Summary

Safety Precautions

Accessories

Indoor Unit Installation Drawings

Preparation before Installation

Front Panel Removal and Installation

Procedure for detaching and reattaching the indoor unit's front panel.

Front Grille Removal and Installation

Steps to remove and install the front grille of the indoor unit.

Setting Unit Addresses

Configuring distinct addresses for multiple indoor units in one room.

HA System Connection

Guidance for connecting the unit to an HA system using wired or central controllers.

Refrigerant Pipe Flaring

Detailed steps for correctly flaring refrigerant pipe ends for secure connections.

Refrigerant Piping Work

Instructions for handling, bending, and insulating refrigerant piping.

Indoor Unit Installation Procedures

Mounting Plate Installation

Process for securely installing the indoor unit's mounting plate on the wall.

Wall Hole and Embedded Pipe Installation

Steps for drilling a wall hole and installing the embedded pipe for unit connection.

Piping, Hoses, and Wiring Layout

Guidance on routing refrigerant pipes, drain hoses, and inter-unit wiring.

Wall Embedded Piping

Specific instructions for inserting the drain hose into a wall for embedded piping.

Electrical Wiring

Detailed instructions for connecting the electrical wiring to the indoor unit.

Drain Piping Installation

Procedures for connecting and extending the drain hose for proper water drainage.

Trial Operation and Testing

Trial Operation Steps

Steps for performing trial operation and testing unit functions after installation.

Post-Installation Test Items

Checklist of essential items to verify during unit testing.

Related product manuals