SiBE041011_A
112 Trial Operation and Field Settings
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................113
2. Forced Cooling Operation ...................................................................114
3. Trial Operation ....................................................................................115
4. Field Settings ......................................................................................116
4.1 Model Type Setting ..............................................................................116
4.2 When 2 Units are Installed in 1 Room..................................................116
4.3 Facility Setting (cooling at low outdoor temperature) ...........................117
4.4 Jumper and Switch Settings.................................................................118
5. Silicon Grease on Power Transistor / Diode Bridge............................119