3-4
No. Inspection item Inspection content PTI
Electrical system
1
Damage of power cable
and plug
✓
2
Inspect condition of
internal wiring
✓
3
Inspect electrical
connections and tighten as
needed
1) Magnetic switch ✓
2) Electrical contractors ✓
3) Terminal block ✓
4
Condition of monitoring
receptacle cover
✓
5 Condition of PC port cover ✓
6 Fuse conditions Open or short connection ✓
7
Inspection of magnetic
switch contact
Contact point inspection ✓
8
Check electrical
insulation
1) Power cable and plug ✓
2) Compressor ✓
3) Condenser fan motor ✓
4) Evaporator fan motor ✓
9
Starting procedure
inspection
✓
10 Temperature sensor
1) Installation condition of sensor ✓
2) Alarm indication ✓
11
PT/CT (voltage and
current) Alarm indication
✓
12
Pressure sensor Alarm
indication
✓
13 Electronic controller Check of wake-up battery ✓
14 Evaporator fan motor
1) Speed switchover ✓
2) Rotation direction ✓
15 Condenser fan motor Rotating direction ✓
16 Evaporator fan
Deformation and damage
inspection
✓
17 Condenser fan
Deformation and damage
inspection
✓
Others
1
Check for abnormal noise
and vibration during
operation
✓
2
Temperature control
function
1) 0℃ operation ✓
2) –18℃ operation ✓
3 Defrost function ✓
4 Clean unit with fresh water ✓
03章LX10F11B3TR16-02En.indd3-403章LX10F11B3TR16-02En.indd3-4 2015/12/2115:43:112015/12/2115:43:11