EasyManua.ls Logo

Daikin Sky Air Advance Series - Refrigerant Piping Insulation; Electrical Wiring Preparation

Daikin Sky Air Advance Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Charging refrigerant
Installation manual
12
RZASG100~140MUV/Y
Sky Air Advance-series
4P734658-1 – 2023.08
b Power supply cable
c Earth leakage circuit breaker
d Fuse
e User interface
Example: RZASG100~140MUV
c
ef
b g
d
d
a
a Switch box
b Stop valve attachment plate
c Terminal block
d Earth wire
e Power supply cable
f Interconnection cable
g Tie wrap
3 Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate and route the wiring
according to the illustration above.
4 Choose a knockout hole and remove the knockout hole by
tapping on the attachment points with a flat head screwdriver
and a hammer.
5 Route the wiring through the frame and connect the wiring to
the frame at the knockout hole.
Routing through
the frame
Choose one of the 3 possibilities:
a
b
a
b
a
b
2
3
1
a Power supply cable
b Interconnection cable
Connecting to the
frame
When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.
When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.
a b
A B
c d e
A Inside of the outdoor unit
B Outside of the outdoor unit
a Wire
b Bush
c Nut
d Frame
e Hose
NOTICE
Precautions when making knockout holes:
Avoid damaging the casing and underlying piping.
After making the knockout holes, we recommend to
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
6 Reattach the service cover.
7 Connect an earth leakage circuit breaker and fuse to the power
supply line.
7 Charging refrigerant
7.1 About charging refrigerant
The outdoor unit is factory charged with refrigerant, but in some
cases the following might be necessary:
What When
Charging additional refrigerant When the total liquid piping
length is more than specified
(see later).
Completely recharging refrigerant Example:
When relocating the system.
After a leak.
Charging additional refrigerant
Before charging additional refrigerant, make sure the outdoor unit's
external refrigerant piping is checked (leak test, vacuum drying).
INFORMATION
Depending on the units and/or the installation conditions, it
might be necessary to connect electrical wiring before you
can charge refrigerant.
Typical workflow Charging additional refrigerant typically consists
of the following stages:

Table of Contents

Other manuals for Daikin Sky Air Advance Series

Related product manuals