Loading...
12 Technical data
Installer reference guide
31
RZA200+250D7Y1B
Sky Air Advance-series
4P573383-1 – 2019.04
2 Maximum two units can be installed.
Not allowed
Multiple rows of units ( )
b (mm)
≥1000
≥200
≥2000
≥100
≥3000
≥1500
b
100
(1)
H
B
H
U
100
(1)
100
(1)
H
B
≤½H
U
b≥250
½H
U
<H
B
≤H
U
b≥300
H
B
>H
U
H
B
H
U
100
(1)
100
(1)
100
(1)
(1) For better serviceability, use a distance ≥250mm
Stacked units (max. 2 levels) ( )
A1
A2
≥500
≥1000
A2
≥500
≥300
100
(1)
100
(1)
B1
A2
B2
≥100
≥300
B2
≥100
≥1000
B2
100
(1)
100
(1)
(1) For better serviceability, use a distance ≥250mm
A1=>A2 (A1) If there is danger of drainage dripping and freezing between the upper and lower units…
(A2) Then install a roof between the upper and lower units. Install the upper unit high enough above the lower unit to prevent ice buildup at the
upper unit's bottom plate.
B1=>B2 (B1) If there is no danger of drainage dripping and freezing between the upper and lower units…
(B2) Then it is not required to install a roof, but seal the gap between the upper and lower units to prevent discharged air from flowing back to the
suction side through the bottom of the unit.
12.3 Piping diagram: Outdoor unit
sv
LPS
HPS
A
B
Service port (with 5/16" flare)
Stop valve
Filter
Check valve
Muffler
Solenoid valve
PCB cooling
Capillary tube
Electronic expansion valve
4‑way valve
High pressure switch
LPS
Low pressure switch
Heat exchanger
Compressor
Distributor

Table of Contents

Other manuals for Daikin Sky Air Advance Series

Related product manuals