EasyManua.ls Logo

Daikin Sky Air Alpha RZAG100N2V1B - Mounting the Outdoor Unit

Daikin Sky Air Alpha RZAG100N2V1B
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 | Installation
Installer reference guide
35
RZAG71~140N2V1+Y1
Sky Air Alpha-series
4P695307-1 – 2022.05
1
3
2
(4)
PH2
8 mm
7.3 Mounting the outdoor unit
7.3.1 About mounting the outdoor unit
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1 Providing the installation structure.
2 Installing the outdoor unit.
3 Providing drainage.
4 Preventing the unit from falling over.
7.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation
7.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of anchor bolts, nuts and washers (field supply) as follows:

Table of Contents

Other manuals for Daikin Sky Air Alpha RZAG100N2V1B

Related product manuals