EasyManua.ls Logo

Daikin Sky Air Alpha RZAG100N2V1B - Page 62

Daikin Sky Air Alpha RZAG100N2V1B
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 | Installation
Installer reference guide
62
RZAG71~140N2V1+Y1
Sky Air Alpha-series
4P695307-1 – 2022.05
Y1
a
b
d
c
a Interconnection cable
b Power supply cable
c Earth
d Cable tie
4 Fix the cables (power supply and interconnection cable) with a cable tie to the
stop valve attachment plate and route the wiring according to the illustration
above.
5 Choose a knockout hole and remove the knockout hole by tapping on the
attachment points with a flat head screwdriver and a hammer.
6 Route the wiring through the frame and connect the wiring to the frame at
the knockout hole.
Routing through the
frame
Choose one of the 3 possibilities:
a
a
a
2
3
1
a Power supply cable
Note: Route the interconnection cable together
with the refrigerant piping. See "7.8.1To finish the
outdoor unit installation"[463].

Table of Contents

Other manuals for Daikin Sky Air Alpha RZAG100N2V1B

Related product manuals