30
Commissioning and Operation
Items to be Conrmed Before Turning on Unit
Ensure that the water pump and the unit are connected.
Use the PCB controller to Control the on and off the water pump using the water pump output on the PCB
controller; otherwise the BPHE may burst due to freezing.
The water pump connection point must have no voltage. If a voltage circuit is connected, basic components may
be damaged.
Power on the unit to preheat the crankcase for at least 12 hours before starting up the unit for the rst time or
after a long-term stoppage. This ensures that the compressor works properly.
Before turning on the unit, check that the water pump is lled with water.
Before turning on the water pump, open the water supply valve, ll the pump with water, and discharge free air
in the system
Wiring of the unit: Check that the diameter of the wires meets requirements; the wires are correctly connected;
the grounding line is securely connected;
Before turning on the unit, clean the water system and ensure that pipes are clean without contaminants.
Make sure that the working conditions do not exceed the rated working range.
Items to be Checked during the Pilot Run
Check the following items after the unit has worked properly for a period of time:
S/N Item Checking Method Reference Standard
1 Power supply voltage Voltage Rated voltage±10%
2 Working current of a single compressor Current 13 - 23A
3 Working current of a single fan Current 2 - 5A
4 Inlet water temperature in cooling operation Temperature 15- 20°C
5 Outlet water temperature in cooling operation Temperature 6 -15°C
6 Inlet/outlet water temperature difference Temperature 2 - 7°C
7 Discharge air temperature of the compressor Temperature 65 -115°C
8 Low pressure in cooling mode Pressure 6.5 - 10.0bar
9 High pressure in cooling mode Pressure 22 - 41.5bar
10 Vibration and operation noise Listen or touch No abnormal vibration or noise
NOTE: THE REFERENCE STANDARDS ARE USED TO CHECK WHETHER A UNIT WORKS PROPERLY ONSITE. REFERENCE
STANDARDS ARE DETERMINED BASED ON THE MAXIMUM AND MINIMUM WORKING CONDITIONS. IF REFERENCE STANDARDS ARE
EXCEEDS AFTER THE UNIT HAS PROPERLY WORKED FOR A PERIOD OF TIME, CONTACT THE LOCAL DEALER OR DAIKIN FOR HELP.