17 | Electrical installation
Installer and user reference guide
94
RKXYQ5T8+8T7Y1B + RDXYQ5T8+8T7V1B
VRV IV heat pump for indoor installation
4P499898-1B – 2021.12
F1 F2 F1 F2 F1 F2
F1 F2 F1 F2 F1 F2
F1 F2 F1 F2 F1 F2
b
X2M
X2M
X2M X1M (A1P)
RKXYQ5 RDXYQ5
TO OUT/DTO IN/D
F1 F2
F1 F2
a1 a2 a2
a
F1 F2 F1 F2 F1 F2
F1 F2 F1 F2 F1 F2
F1 F2 F1 F2 F1 F2
b
a
RKXYQ8 RDXYQ8
TO OUT/DTO IN/D
F1 F2
F1 F2
8 HP5 HP
a Sheathed + shielded cable (2 wires) (no polarity)
a1, a2 Connection of shield to earth
b Terminal board (field supply)
NOTICE
Shielded cable. Using shielded cable for the transmission wiring is mandatory for
5HP, and optional for 8HP.
X2M
F1 F2
F1 F2
a1
X1M
X1M (A1P)
5 HP 8 HP
X2M
a2
F1 F2
X2M
a2
F1 F2
RKXYQ5 RDXYQ5 RKXYQ8 RDXYQ8
a1, a2 Earth (use the screw delivered as accessory)
When using shielded cable:
▪ In case of 5HP (a1 and a2): Connect the shield to the earth of the compressor
unit and the heat exchanger unit.
▪ In case of 8 HP (only a2): Connect the shield only to the earth of the heat
exchanger unit.
3 Connect the power supply as follows:
3N~ 50 Hz
380-415 V
L1 L2 L3
L1 L2 L3
N
X1M
a
b
c
a Earth leakage circuit breaker
b Fuse
c Power supply cable
4 Route the wiring through the frame, and fix the cables (power supply and
transmission wiring) with cable ties.