EasyManua.ls Logo

Daikin WDC - Table of Contents

Daikin WDC
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IOM 1281-2 • CENTRIFUGAL WATER CHILLERS 2 www.DaikinApplied.com


©2023 Daikin Applied, Minneapolis, MN. All rights reserved throughout the world.This document contains the most current product information as
of this printing. Daikin Applied Americas Inc. has the right to change the information, design, and construction of the product represented within the
document without prior notice. For the most up-to-date product information, please go to www.DaikinApplied.com.
™® MicroTech, SiteLine, and Daikin Applied are trademarks or registered trademarks of Daikin Applied Americas Inc. The following are trademarks
or registered trademarks of their respective companies: BACnet from American Society of Heating, Refrigerating and Air-Conditioning Engineers,
Inc.; Echelon, LonWorks, LonMark, and LonTalk from Echelon Corporation; Modbus from Schneider Electric; and Windows from Microsoft
Corporation.
Table of Contents
Introduction .................................5
 ...............5
General Description .........................6
Installation ..................................7
Receiving and Handling ......................7
Location ..................................8
Operating Limits............................9
Field Insulation.............................9
Water Piping..............................10
Water Quality Guidelines ....................10
Vessel Drains at Startup ....................11
Flow Switches ............................11
Variable Fluid Flow Rates ...................11
System Water Volume ......................11
System Pumps............................11
Condenser Water Temperature Control .........11
Cooling Tower Control ......................12
Water Side Economizer Cycle Operation........12
Relief Valves .............................13
Oil Coolers ...............................14
Oil Heater................................15
Field Wiring ..............................18
Building Automation Systems (BAS) ...........19
Use with On-Site Generators .................19
Field Wiring, Controls & Starters ..............20
 ........................25
Operation .................................33
Dual/Multi-Chiller Operation..................33
Ice Mode Operation ........................34
Operator Responsibilities....................34
Operator Schools ..........................34
Unit Enabling/Disabling .....................34
Human Machine Interface (HMI) ..............35
Tower Control Settings .....................50
Alarms ..................................56
Controller Inputs and Outputs ................61
Maintenance ...............................63
Routine Maintenance .......................63

Related product manuals