AIR-COOLED FLUID COOLER
12 Air-Cooled Condenser Manual
As a precaution, review the following checklist to ensure proper operation. Failure to meet the
following conditions could result in voiding the warranty:
Only qualified and experienced service technicians should perform installation and
maintenance on this product.
Check for any damage.
Check all wiring connections.
Equipment damage and personal injury can result from improper piping installation,
leak checking and improper handling.
This equipment is designed to operate properly and produce rated capacities when
installed in accordance with industry standards.
System piping must be installed following industry standards for good piping practices.
System must be thoroughly leak checked before initial charging
System power supply must meet Voltage Tolerance (see section 4.5).
All controls and safety devices properly connected per wiring diagram.
Factory installed wiring must not be changed without written factory approval.
Additionally, the fluid piping must comply with local code.
Additionally, the fluid piping must comply with local code.
It is recommended that the installing contractor provide shutoff valves and unions to
permit easy access to parts for either repair or replacement.
After piping is completed all joints (and connections) should be leak tested.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Data Aire GHFC Series and is the answer not in the manual?

Data Aire GHFC Series Specifications

General IconGeneral
BrandData Aire
ModelGHFC Series
CategoryAccessories
LanguageEnglish

Related product manuals