round-hole methods. The tooled installation methods include two-post ush mount, two-
post center mount, or four-post threaded mount.
NOTE: To install the S5212F-ON switch, see One-half U front-rack installation. To
install the S5296F-ON switch, see Two U four-post rack assembly.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside
rail.
NOTE: For more installation instructions, see the installation labels attached to the
rail assembly.
Figure 11. Separate rails
20
S5200F-ON Series switch Installation