EasyManua.ls Logo

Dell EMC S5232F-ON - User Manual

Dell EMC S5232F-ON
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
S5200F-ON Series Installation Guide
September 2018

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Dell EMC S5232F-ON and is the answer not in the manual?

Dell EMC S5232F-ON Specifications

General IconGeneral
BrandDell EMC
ModelS5232F-ON
CategorySwitch
LanguageEnglish

Summary

About this guide

Regulatory

Details regulatory models for S5232F-ON, S5248F-ON, and S5296F-ON switches.

Related documents

Lists additional documentation for the S5200F-ON Series, including guides and release notes.

Information symbols

Explains the meaning of NOTE, CAUTION, and WARNING icons used throughout the guide.

S5200 F-ON Series switch

Introduction

Overview of the S5200F-ON Series switch, its capabilities, and port configurations.

Features

Highlights the key features of the S5200F-ON Series switch, including ports and components.

Physical dimensions

Specifies the physical dimensions for the S5232F-ON, S5248F-ON, and S5296F-ON switch models.

LED display

Describes the LED indicators on the switch's I/O side and their function during ONIE operations.

LED behavior

Details the various LED states and their meanings for S5232F-ON, S5248F-ON, and S5296F-ON switches.

Prerequisites

Lists essential components and conditions required for a successful switch installation.

S5200 F-ON Series switch configurations

Outlines the different hardware configurations available for the S5200F-ON Series switches.

Luggage tag

Explains the function and location of the switch's pull-out luggage tag for identification.

Site preparations

Site selection

Covers requirements for choosing an appropriate installation site, including environmental and security factors.

Cabinet placement

Provides guidelines for placing the switch within suitable indoor cabinets for optimal operation.

Rack mounting

Details the process of preparing and grounding the equipment rack for switch installation.

Switch ground

Explains the importance and procedure for grounding the switch for safety and compliance.

Fans and airflow

Describes the switch's fan support for two airflow options: normal and reverse.

Fan combinations

Discusses fan installation, SKU types, and the necessity of consistent airflow direction within the switch.

Power

Outlines the procedure for connecting the switch to its power source, adhering to electrical codes.

Storing components

Provides guidelines for the proper storage of the switch and its accessories when not in immediate use.

S5200 F-ON Series switch installation

Unpack

Instructions for inspecting the shipping container and verifying all switch components upon receipt.

Unpacking Steps

A step-by-step guide for carefully unpacking the switch and its associated accessories.

Rack or cabinet hardware installation

Explains options for physical mounting, including rack shelves, direct mounting, and ReadyRails system compatibility.

Rack mount safety considerations

Highlights critical safety precautions for rack loading, power, temperature, and airflow during installation.

ReadyRails installation

Details the installation process for the ReadyRails system for 1U front-rack and two-post mounting.

Tool-less square-hole installation

Describes the method for installing rack rails using the tool-less square-hole mounting system.

Two-post flush-mount installation

Explains the procedure for flush-mounting rack rails in a two-post rack configuration.

Two-post center-mount installation

Details the steps for center-mounting rack rails in a two-post rack configuration.

Four-post threaded installation

Describes the process of installing rack rails using a four-post threaded mounting system.

Switch installation

Guides on sliding the switch into the prepared rack rails for 1U and four-post configurations.

1 U front-rack installation

Provides instructions for attaching the 1U switch rails to the switch unit itself.

S5296 F-ON four-post rack assembly

Specific instructions for installing the S5296F-ON model in a four-post rack assembly.

Four-post rack mount

Discusses safety considerations pertinent to mounting equipment in a four-post rack.

Ground cable

Details the procedure for connecting the ground cable to ensure proper grounding of the switch.

Optics installation

Guides on the correct procedure for installing optical transceivers into the switch's optical ports.

Optics removal

Explains the safe method for removing optical transceivers from the switch ports.

Switch start up

Covers pre-power-on checks and the initial startup sequence for the installed switch.

After switch placement

Provides post-installation guidance, including software configuration and documentation references.

Switch replacement

Outlines the steps for removing and replacing an existing switch with a new unit.

Power supplies

Components

Lists the available power supply options and their characteristics for the S5200F-ON Series switch.

AC or DC power supply installation

Details the procedure for installing both AC and DC power supply units into the switch chassis.

DC power supply to power source connection

Explains the specific wiring and connection steps for DC power supplies to the power source.

Fans

Components

Identifies the S5200F-ON Series switch's fan modules and their types.

Fan module installation

Describes the process of installing fan modules, emphasizing the importance of matching airflow directions.

Management ports

RS-232 console port access

Guides on connecting and using the RS-232 console port for initial switch management.

MicroUSB-B console port access

Details the procedure for connecting and using the MicroUSB-B console port for switch management.

USB storage mount

Explains how to mount USB storage devices for file transfers and OS installation.

Before you install an OS

Covers the switch's POST process and the Grub bootloader selection for OS installation.

Grub bootloader example

Presents an example of the Grub bootloader menu, showing OS installation options.

ONIE example

Provides examples of ONIE commands for OS installation and discovery.

Check your switch

Instructions on using `onie-sysinfo` to verify the correct operation of the ONIE environment.

ONIE service discovery

Describes ONIE's methods for locating and installing operating systems, including manual installation.

Specifications

Chassis physical design

Details the physical dimensions, weight, and clearance requirements for the switch models.

IEEE standards

Lists the IEEE standards that the S5200F-ON Series switch complies with for network functionality.

Agency compliance

Covers various agency compliance statements, including FCC and EU EMC directives.

USA Federal Communications Commission statement

States the FCC compliance for Class A digital devices and operational conditions.

European Union EMC directive conformance statement

Confirms the product's conformity with the EU EMC directive for electromagnetic compatibility.

Japan VCCI compliance for class A equipment

Explains Japan's VCCI compliance for Class A equipment and potential interference issues.

Korean certification of compliance

Details Korean compliance certifications relevant to the switch's radio and communication equipment standards.

Safety standards and compliance agency certifications

Lists key safety standards and certifications, such as UL and CSA compliance for the product.

Electromagnetic compatibility

Provides information on emissions and immunity standards related to electromagnetic compatibility.

Product recycling and disposal

Offers guidance on responsible recycling and disposal of the switch according to local and national regulations.

Dell EMC support

Dell EMC support

Directs users to the Dell EMC support website for technical documentation, software, and assistance.

Related product manuals