EasyManua.ls Logo

Dell EMC S5232F-ON - Two-post flush-mount installation

Dell EMC S5232F-ON
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 13. 1U tool-less nonthreaded square hole installation
2 Align and seat the front ange pegs in the holes on the front side of the vertical post.
NOTE: Be sure that the rails click into place and are secure.
3 Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each ange ear and unseat each rail.
Two-post ush-mount installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
NOTE: For S5296F-ON installation instructions, see S5296F-ON four-post rack assembly.
1 Remove the castings from the front side of each ReadyRails assembly, see item 1 in the following illustration. Use a torx screwdriver to
remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for
future rack requirements. Do not remove the back latch castings.
26
S5200F-ON Series switch installation

Table of Contents

Related product manuals