EasyManua.ls Logo

Dell EMC S5232F-ON - Two-post flush-mount installation

Dell EMC S5232F-ON
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 13. 1U tool-less nonthreaded square hole installation
2 Align and seat the front ange pegs in the holes on the front side of the vertical post.
NOTE: Be sure that the rails click into place and are secure.
3 Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each ange ear and unseat each rail.
Two-post ush-mount installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
NOTE: For S5296F-ON installation instructions, see S5296F-ON four-post rack assembly.
1 Remove the castings from the front side of each ReadyRails assembly, see item 1 in the following illustration. Use a torx screwdriver to
remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for
future rack requirements. Do not remove the back latch castings.
26
S5200F-ON Series switch installation

Table of Contents