Figure 18. Front rack installation
NOTE
: Do not the use the mounted ReadyRails as a shelf or a workplace.
3 Tighten the two thumbscrews and rack screws.
To remove the switch from the rack or cabinet, press in the two side-release bars on the switch simultaneously and slide the switch
forward.
S5296F-ON four-post rack assembly
Due to the chassis weight, the S5296F-ON switch does not support a two-post rack installation; you must install the S5296F-ON in a four-
post rack.
To install in a four-post rack, follow the instructions in your rack frame kit. In a four-post rack, the maximum distance between the front and
back vertical posts is 36 inches (91.44 cm); the minimum distance is 24 inches (60.96).
CAUTION
: Use two people, an equipment lift, or pallet jack when lifting or moving the chassis. Install the chassis into the rack
before inserting the chassis components. Lift the chassis only from the bottom. Lifting by the chassis shelves or power supply
openings might damage the chassis.
Four-post rack mount
Rack mounting safety considerations
S5200F-ON Series switch installation
31