EasyManua.ls Logo

Dell 100 Series - 2 U1 N Configuration Installation Guidelines

Dell 100 Series
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2U1N configuration installation guidelines
Assuming installation is into an empty rack, always begin component installation at the
bottom of the cabinet and work upward. Install components at the lowest available
space for that component type.
If you are installing the minimum configuration, the stack up will be as follows:
Table 3 Stack up for a minimum configuration
Component
Function
Description Quantity Cabinet U Space
Data Server Quanta 2U1N Server 3 2 - 7
Management Server Kylin 1U Server 1 20
Management Switch Arista 7010T-48 1 21
Data Switch Arista 7050-64 2 23 - 24
If you are installing the maximum configuration, the stack up will be as follows:
Table 4 Stack up for a maximum configuration
Component
Function
Description Quantity Cabinet U Space
Data Server Quanta 2U1N Server 17 2 - 19 and 25 - 40
Management Server Kylin 1U Server 1 20
Management Switch Arista 7010T-48 1 21
Data Switch Arista 7050-64 2 23 - 24
The following illustration represents the maximum 2U1N configuration.
2U1N Configuration Equipment Installation
18 VxRack Node Hardware Installation Guide

Table of Contents

Related product manuals