EasyManuals Logo

Dell Z9100-ON Installation Guide

Dell Z9100-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each ange ear and unseat each rail.
Two-post ush-mount conguration
CAUTION: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1 For this conguration, remove the latch castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front ange ear on the switch side of the rail and remove each latch casting, use a Torx
screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back ange castings.
Figure 10. Two-post ush-mount conguration
2 Attach one rail to the front post ange with two user-supplied screws, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post ange with two user-supplied
screws. See item 3.
4 Repeat this procedure for the second rail.
Two-post center-mount conguration
CAUTION
: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post ange with two user-supplied
screws, item 1.
Z9100–ON installation
21

Table of Contents

Other manuals for Dell Z9100-ON

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Z9100-ON and is the answer not in the manual?

Dell Z9100-ON Specifications

General IconGeneral
BrandDell
ModelZ9100-ON
CategorySwitch
LanguageEnglish

Related product manuals