Do you have a question about the Dell EMC PowerSwitch Z9100–ON and is the answer not in the manual?
Forwarding Rate | 4.76 Bpps |
---|---|
Product Type | Data Center Switch |
Flash Memory | 16 GB |
Form Factor | 1U |
Ports | 32 x 100GbE |
Switching Capacity | 6.4 Tbps |
Power Supply | Dual, hot-swappable |
Operating Temperature | 0°C to 40°C |
Latency | < 1 µs |
CPU | Intel |
Memory | 16 GB |
Operating System | Dell Networking OS9 |
Management | CLI, SNMP, Web |
Dimensions (H x W x D) | 4.4 cm (1.73 in) x 43.4 cm (17.09 in) |
Lists supporting documentation for the Z9100-ON switch, including getting started and configuration guides.
Provides an overview of the Z9100-ON switch, its features, and connections.
Details the various hardware and functional features offered by the Z9100-ON switch.
Lists the physical dimensions, weight, and rack clearance requirements for the Z9100-ON switch.
Describes the LED indicators located on the I/O side of the Z9100-ON switch.
Explains the behavior of various LEDs on the Z9100-ON switch during ONIE operations.
Describes the LED indicators for QSFP28 and SFP+ ports, including link status and activity.
Details the various supported hardware configurations and airflow options available for the Z9100-ON switch.
Describes the pull-out luggage tag on the I/O side containing essential switch ID information like service tag and MAC address.
Details criteria for selecting a suitable installation site, including environmental factors like temperature and humidity.
Outlines requirements for placing the Z9100-ON within appropriate cabinets and racks for controlled environments.
Instructions for preparing and grounding the equipment rack for safe and proper mounting.
Explains the two airflow direction options (normal/reverse) and fan combinations for effective cooling.
Details connecting the switch to the power source, including safety precautions and electrical code requirements.
Provides guidelines for properly storing the switch and optional components if not installed immediately.
Critical warnings regarding port connections and AC power sources to ensure NEBS compliance.
Steps for installing the ground lug assembly and connecting the ground cable to meet NEBS requirements.
Instructions for unpacking the Z9100-ON switch and verifying all included items are present.
Details how to attach a dedicated ground wire to the switch for AC and DC powered systems.
Describes methods for mounting the switch in a rack or cabinet using the provided ReadyRails system.
Important safety considerations and best practices for mounting equipment in racks to prevent damage or injury.
Step-by-step instructions for performing a 1U tool-less installation using the ReadyRails system.
Steps for performing a two-post flush-mount installation using the ReadyRails system.
Steps for performing a two-post center-mount installation using the ReadyRails system.
Instructions for installing the switch using a four-post threaded rack configuration with the ReadyRails system.
Steps for configuring rails and attaching inner switch rails for a 1U front-rack mounting.
Instructions for installing and safely removing optical transceivers into the SFP+ ports.
Recommendations for distributing port groups across port pipes for optimal buffer resource usage.
Details the steps and checks required before powering up the Z9100-ON switch.
Guidance on configuring the switch after it has been securely installed and powered on.
Step-by-step procedures for removing and replacing a switch, including configuration backup and restoration.
Lists the available AC or DC power supply options and their integrated fan features for the Z9100-ON.
Step-by-step instructions for installing AC or DC power supply units into the switch chassis.
Details the components and procedure for connecting a DC power supply to the switch.
Instructions for safely replacing AC or DC power supply units in the Z9100-ON switch.
Lists the different Z9100-ON fan module components, including normal and reverse flow types.
Steps for installing and replacing fan modules, emphasizing the importance of matching airflow directions.
Instructions for replacing fan air filters, including required filter specifications and maintenance intervals.
Instructions for connecting to the switch via the RS-232 console port for management and configuration.
Steps for connecting to the switch using the MicroUSB-B console port, including driver installation.
Procedures for mounting and using USB storage devices with the Z9100-ON switch.
Information on the power-on self-test (POST) and Grub bootloader before installing an operating system.
Explanation of the ONIE (Open Network Install Environment) options and their functions for OS installation and diagnostics.
How to use the `onie-sysinfo` command to verify ONIE functionality and system information.
Details the physical dimensions, weight, and rack clearance requirements for the Z9100-ON switch.
Lists the operating and storage environmental parameters, including temperature and humidity limits for the switch.
Specifies the AC and DC power input requirements and lists relevant IEEE standards.
Overview of safety, agency compliance requirements, and the USA Federal Communications Commission statement.
Emission compliance statements for Industry Canada and the European Union EMC Directive.
Compliance statements for Japan VCCI and Korean certification requirements.
Lists various safety standards, agency certifications, and electromagnetic compatibility details including emissions and immunity.
Guidance on responsible recycling and disposal of the switch according to local and national regulations.
Information on accessing Dell EMC support website for technical information, software, drivers, and documentation.