Figure 11. Two-post center-mount configuration
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, item 2.
3. Repeat this procedure for the second rail.
Four-post threaded configuration
CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in
Step 1.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver, item 1.
Retain the latch castings for future rack requirements.
22
Z9100ON installation

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell EMC PowerSwitch Z9100–ON and is the answer not in the manual?

Dell EMC PowerSwitch Z9100–ON Specifications

General IconGeneral
BrandDell
ModelEMC PowerSwitch Z9100–ON
CategorySwitch
LanguageEnglish

Related product manuals