EasyManua.ls Logo

Dell EMC PowerSwitch S5148F-ON - User Manual

Dell EMC PowerSwitch S5148F-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Dell EMC PowerSwitch S5148F-ON
Installation Guide
July 2021
July 2021
Rev. A04

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Dell EMC PowerSwitch S5148F-ON and is the answer not in the manual?

Dell EMC PowerSwitch S5148F-ON Specifications

General IconGeneral
BrandDell
ModelEMC PowerSwitch S5148F-ON
CategorySwitch
LanguageEnglish

Summary

About this guide

Related documents

Lists other Dell EMC documents providing more information about the S5148F-ON switch.

Information symbols

Explains the meaning of various icons used in the guide for notes, cautions, and warnings.

S5148 F-ON switch

Introduction

Provides an overview of the S5148F-ON switch, its form factor, and connectivity.

Features

Details the key features and capabilities of the S5148F-ON switch.

Physical dimensions

Specifies the physical size and weight of the S5148F-ON switch.

LED display

Identifies the location of LED displays on the S5148F-ON switch.

LED behavior

Describes the meaning of different states for the switch's LEDs.

Prerequisites

Lists the components and tools required for successful switch installation.

S5148 F-ON switch configurations

Outlines the different configurations available for the S5148F-ON switch.

Luggage tag

Explains the function and information contained on the switch's pull-out luggage tag.

Site preparations

Site selection

Provides requirements for selecting a suitable installation location for the switch.

Cabinet placement

Details the requirements for placing the switch within a rack or cabinet.

Rack mounting

Instructions for mounting the switch into a rack.

Fans and airflow

Information on fan airflow options and ensuring proper ventilation.

Power

Guidelines for connecting the switch to a power source.

Storing components

Recommendations for storing the switch and its components before installation.

NEBS compliance

Important information

Key warnings and considerations for achieving NEBS compliance.

NEBS-compliant ground installation

Step-by-step instructions for installing the ground lug assembly for NEBS compliance.

S5148 F-ON switch installation

Rack or cabinet hardware installation

Details on mounting the switch using various rack hardware methods.

ReadyRails installation

Instructions for installing the ReadyRails mounting system for the switch.

Switch installation

Procedures for physically mounting the switch into the prepared rack rails.

Ground cable

Steps for connecting the ground cable to the switch for safety and compliance.

Optics installation

Guidance on inserting and securing optical transceivers into switch ports.

Switch power-up

Procedure and checks before powering on the installed switch.

After switch placement

Steps to take after the switch has been installed and powered on.

Switch replacement

Instructions for removing an existing switch and installing a replacement.

Power supplies

Components

Describes the available power supply options and their characteristics.

AC or DC power supply installation

Detailed steps for installing AC or DC power supply units into the switch.

DC power supply to power source connection

Guidance on connecting DC power supplies to the power source.

Fans

Components

Lists and describes the S5148F-ON switch fan modules.

Fan module installation

Instructions for installing fan modules into the switch.

Management ports

RS-232 console port access

Procedure for accessing the switch console via an RS-232 serial port.

MicroUSB-B console port access

Procedure for accessing the switch console via a MicroUSB-B port.

USB storage mount

Steps for mounting USB storage devices to the switch.

Before you install an OS

Information and procedures related to installing an operating system.

ONIE service discovery

Details on how ONIE discovers and installs operating systems.

Specifications

Chassis physical design

Specifies the physical dimensions and weight of the switch chassis.

Environmental parameters

Details operating and storage temperature, humidity, and altitude limits.

AC power requirements

Lists the electrical power requirements for AC-powered switches.

DC power requirements

Lists the electrical power requirements for DC-powered switches.

IEEE standards

Lists the IEEE standards that the S5148F-ON switch complies with.

Agency compliance

Statements and requirements for various agency certifications.

Japan VCCI compliance for class A equipment

Compliance statement for Japan's VCCI Class A equipment regulations.

Korean certification of compliance

Information regarding Korean compliance certifications for the equipment.

Safety standards and compliance agency certifications

Lists various safety standards and compliance certifications met by the product.

Electromagnetic compatibility

Details on EMC emissions and immunity standards the switch adheres to.

Product recycling and disposal

Guidance on the proper recycling and disposal of the switch.

Dell EMC support

Related product manuals