EasyManua.ls Logo

Dini Argeo MCW - Maintenance and Checks; Daily Monitoring

Dini Argeo MCW
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
MAINTENANCE AND CHECKS
The electronic crane scale and all lifting accessories must be regularly subjected to inspection
and maintenance.
For the prevention of accidents or damages, it is necessary that the maintenance is done
according to the manufacturer's instructions. Maintenance must be performed only by persons
who have acquired the necessary technical expertise.
To ensure a safe operation, follow these instructions:
- carry out a continuous regular maintenance and cleaning.
- entrust the maintenance and repair operations only to trained and authorized personnel
- use only original spare parts.
- do not use the electronic crane scale where there is non-compliance with the safety
checklist.
- any maintenance, repair or cleaning should be done away from danger areas and with the
electronic crane scale turned off.
Daily monitoring
Each time the operator starts a new work cycle with the electronic crane scale, one must:
- check all instrument parts;
- carry out a general visual inspection of the whole system;
- Check the integrity and efficiency of all parts of the weighing system like the safety lever of
the hooks, the locking nuts screwed well with the pin, the shackles, etc..

Table of Contents

Related product manuals