EasyManua.ls Logo

Ditch Witch JT920 - Drilling Unit Lubrication Schedule

Ditch Witch JT920
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
120 JT920/JT920L - LUBRICATION
DRILLING UNIT
120 JT920/JT920L - LUBRICATION
DRILLING UNIT
DRILLING UNIT
Reference Hours Description Lubricant Points
13 4 Lube water swivel MPG 2
1, 2, 3 10 Check engine oil DEO 1
5, 6, 8 Check hydraulic oil THF 1
1, 2, 3, 4 50 Change engine oil (initial) DEO 1
7 Change hydraulic oil filter (initial)
10 Lube thrust chain DEO
15 Check drilling fluid pump oil 30W 1
11, 12 Check rotation gearbox oil MPL
1, 2, 3, 4 100 Change engine oil DEO
7 Change hydraulic oil filter
9 Lube flange bearings MPG 2
14, 15 750 Change drilling fluid pump oil 30W 1
5, 6, 8 1000 Change hydraulic oil THF 1
11, 12 Change rotation gearbox oil MPL 1
as
needed
Lube pipe loader shuttle slide MPG 1
Change pipe auto lubricator tube TJC 1
om0122c.eps
DRILLING UNIT
Reference Hours Description Lubricant Points
13 4 Lube water swivel MPG 2
1, 2, 3 10 Check engine oil DEO 1
5, 6, 8 Check hydraulic oil THF 1
1, 2, 3, 4 50 Change engine oil (initial) DEO 1
7 Change hydraulic oil filter (initial)
10 Lube thrust chain DEO
15 Check drilling fluid pump oil 30W 1
11, 12 Check rotation gearbox oil MPL
1, 2, 3, 4 100 Change engine oil DEO
7 Change hydraulic oil filter
9 Lube flange bearings MPG 2
14, 15 750 Change drilling fluid pump oil 30W 1
5, 6, 8 1000 Change hydraulic oil THF 1
11, 12 Change rotation gearbox oil MPL 1
as
needed
Lube pipe loader shuttle slide MPG 1
Change pipe auto lubricator tube TJC 1
om0122c.eps

Related product manuals