96 JT920/JT920L - OPERATION
REMOVE/ADD PIPE BOX
96 JT920/JT920L - OPERATION
REMOVE/ADD PIPE BOX
REMOVE/ADD PIPE BOX
Crushing weight. If load falls or
moves it could kill or crush you. Use proper
procedures and equipment or stay away.
Use hoist capable of supporting the equipment's size and weight.
See SPECIFICATIONS or measure and weigh equipment before
lifting.
NOTICES:
• Always walk around unit and check for obstructions before
moving load.
• Do not take your eyes off moving load. Always look in the
direction load is moving.
• Never swing a load over people.
• Never remove pins (4) from ends of pipe box until you have
attached lifting device. Box may fall if pipe lift switch is
pressed without end pins in place.
Prepare
If you are removing a pipe box with
pipes in it, raise pipes with pipe lifter,
install storage pin (5) on each end of
pipe box, and lower pipes before
beginning procedure.
REMOVE/ADD PIPE BOX
Crushing weight. If load falls or
moves it could kill or crush you. Use proper
procedures and equipment or stay away.
Use hoist capable of supporting the equipment's size and weight.
See SPECIFICATIONS or measure and weigh equipment before
lifting.
NOTICES:
• Always walk around unit and check for obstructions before
moving load.
• Do not take your eyes off moving load. Always look in the
direction load is moving.
• Never swing a load over people.
• Never remove pins (4) from ends of pipe box until you have
attached lifting device. Box may fall if pipe lift switch is
pressed without end pins in place.
Prepare
If you are removing a pipe box with
pipes in it, raise pipes with pipe lifter,
install storage pin (5) on each end of
pipe box, and lower pipes before
beginning procedure.