156 JT920/JT920L - APPENDIX
B. ENTRY PITCH, SETBACK, AND DEPTH
156 JT920/JT920L - APPENDIX
B. ENTRY PITCH, SETBACK, AND DEPTH
B. ENTRY PITCH, SETBACK, AND DEPTH
Entry pitch, setback, and depth work together with bend limits to
determine bore path. Entry pitch is drilling unit slope compared to
level ground. Setback is distance from entry to horizontal.
Minimum depth is measured at point bore becomes horizontal.
JT920 Power Pipe Drill Pipe
EA SB d D
-18 24 ft 9 in (7.54 m) 1 ft 1 in (.34 m) 2 ft 9 in (.84 m)
-20 26 ft 9 in (8.14 m) 1 ft 3 in (.37 m) 3 ft 3 in (1.00 m)
-22 28 ft 8 in (8.74 m) 1 ft 4 in (.41 m) 3 ft 10 in (1.16 m)
-24 30 ft 7 in (9.32 m) 1 ft 6 in (.44 m) 4 ft 4 in (1.33 m)
-26 32 ft 5 in (9.90 m) 1 ft 7 in (.48 m) 4 ft 11 in (1.51 m)
-28 34 ft 4 in (10.46 m) 1 ft 8 in (.51 m) 5 ft 7 in (1.70 m)
-30 36 ft 2 in (11.02 m) 1 ft 10 in (.55 m) 6 ft 3 in (1.90 m)
Based on:
1. 105’ (32 m) minimum bend radius
2. L = beacon housing, EZ-Connect, and transition sub, and 1/3 of first
drill pipe (totalling 6’t 3” [1.9 m]) in the ground before steering
B. ENTRY PITCH, SETBACK, AND DEPTH
Entry pitch, setback, and depth work together with bend limits to
determine bore path. Entry pitch is drilling unit slope compared to
level ground. Setback is distance from entry to horizontal.
Minimum depth is measured at point bore becomes horizontal.
JT920 Power Pipe Drill Pipe
EA SB d D
-18 24 ft 9 in (7.54 m) 1 ft 1 in (.34 m) 2 ft 9 in (.84 m)
-20 26 ft 9 in (8.14 m) 1 ft 3 in (.37 m) 3 ft 3 in (1.00 m)
-22 28 ft 8 in (8.74 m) 1 ft 4 in (.41 m) 3 ft 10 in (1.16 m)
-24 30 ft 7 in (9.32 m) 1 ft 6 in (.44 m) 4 ft 4 in (1.33 m)
-26 32 ft 5 in (9.90 m) 1 ft 7 in (.48 m) 4 ft 11 in (1.51 m)
-28 34 ft 4 in (10.46 m) 1 ft 8 in (.51 m) 5 ft 7 in (1.70 m)
-30 36 ft 2 in (11.02 m) 1 ft 10 in (.55 m) 6 ft 3 in (1.90 m)
Based on:
1. 105’ (32 m) minimum bend radius
2. L = beacon housing, EZ-Connect, and transition sub, and 1/3 of first
drill pipe (totalling 6’t 3” [1.9 m]) in the ground before steering