58 JT920/JT920L - PREPARATION
INSPECT SITE
58 JT920/JT920L - PREPARATION
INSPECT SITE
Select Start and End Points
Select one end to use as a starting point. Consider the following
when selecting a starting point:
Slope
Fluid system should be parked on a level site. Consider how
slope will affect drilling unit setup, bending pipe, and fluid flow out
of hole.
Traffic
Vehicle and pedestrian traffic must be a safe distance from
drilling equipment. Allow at least 10’ (3 m) buffer zone around
equipment.
Space
Check that starting and ending points allow enough space for
gradual pipe bending. See "Minimum Setback" in this chapter.
Check that there is enough space to work and to set up electric
strike system.
Comfort
Consider shade, wind, fumes, and other site features.
Drill downhill when possible so fluid will flow away from drilling
unit.
Select Start and End Points
Select one end to use as a starting point. Consider the following
when selecting a starting point:
Slope
Fluid system should be parked on a level site. Consider how
slope will affect drilling unit setup, bending pipe, and fluid flow out
of hole.
Traffic
Vehicle and pedestrian traffic must be a safe distance from
drilling equipment. Allow at least 10’ (3 m) buffer zone around
equipment.
Space
Check that starting and ending points allow enough space for
gradual pipe bending. See "Minimum Setback" in this chapter.
Check that there is enough space to work and to set up electric
strike system.
Comfort
Consider shade, wind, fumes, and other site features.
Drill downhill when possible so fluid will flow away from drilling
unit.