EasyManua.ls Logo

DJH MEK RUB TEST MACHINE - Installing MEK Reservoir

DJH MEK RUB TEST MACHINE
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
UNPACKING & INSTALLATION
Installing MEK Reservoir
3. Connect the ow line coming from the
rubbing block to the ow valve located on the
bottom of the reservoir as shown
4. Tighten the tting by hand then use a
10mm wrench tighten an additional ¼ turn.
Excessive tightening may collapse the ferrell
and restrict the solvent ow.
5. Connect the air supply line from the
machine base to the back of the reservoir
assembly.