EasyManua.ls Logo

Donaldson Torit DFT 4-16 User Manual

Donaldson Torit DFT 4-16
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation
and Operation Manual
IOM AD3310701
Revision 7
Downflo
®
II
DFT 2-8, 2-12, 2-16, 2-24, 2-36
DFT 3-12, 3-24, 3-26, 3-48, 3-60, 3-72,
DFT 4-16, 4-32, 4-48, 4-64, 4-80, 4-96, 4-112, 4-128
Units Built After July 2003
Throughout this manual
statements indicating
precautions necessary
to avoid equipment failure
are referenced in a Note. Statements
indicating potential hazards that
could result in personal injury or
property damage are referenced
in a CAUTION! box.
Installation,
Operation, and
Service Information
This manual is property of the owner. Leave with the unit when set-up and start-
up are complete. Donaldson Company reserves the right to change design and
specifications without prior notice.
Question and Answer IconNeed help?

Do you have a question about the Donaldson Torit DFT 4-16 and is the answer not in the manual?

Donaldson Torit DFT 4-16 Specifications

General IconGeneral
BrandDonaldson Torit
ModelDFT 4-16
CategoryIndustrial Equipment
LanguageEnglish

Summary

Description

Purpose and Intended Use

Rating and Specification Information

Operation

Inspection and Installation Procedures

Inspection on Arrival

Initial checks and reporting procedures for unit delivery.

Installation Codes and Procedures

Guidelines for complying with codes and proper installation practices.

Site and Unit Location

Criteria for selecting a suitable installation site and positioning the unit.

Electrical and Rigging Instructions

Electrical Wiring

Guidelines for safe and compliant electrical connections and wiring.

Rigging and Hoisting Information

Procedures for safely lifting, moving, and handling the equipment.

Typical Installation Guide

Equipment and Assembly

Standard Equipment

List of components included as standard with the unit.

Field Assembly

Instructions for assembling units shipped in multiple modules.

Module Assembly

Yoke, Venturi, and Filter Installation

Hopper Installation

Leg Installation

Compressed Air Installation

Solid-State Timer Installation

Solenoid Connection

Details on wiring solenoid valves to the solid-state timer.

Timer and Solenoid Specifications

Specifications for the timer input, output, and solenoid valve operation.

Start-Up and Service Procedures

Preliminary Start-Up

Final checks and procedures before initial unit operation.

Service Information and Checklist

Routine monitoring and maintenance checks for operational performance.

Filter Removal

Step-by-step guide for safely removing used filter cartridges.

Filter Replacement and Maintenance

Filter Replacement

Procedures for installing new filter cartridges and ensuring a proper seal.

Dust Disposal

Instructions for safely emptying dust containers and managing collected material.

Compressed Air Components

Information on checking and maintaining compressed air system components.

Optional Equipment - Power Pack

Side-Mount Power Pack Installation

55-Gallon Drum Pack Installation

Magnehelic Gauge Installation

Photohelic Gauge Installation

Delta P Control System

Delta P Plus Control System

Transition and Rotary Valve Installation

Damper and Silencer (TBI) Installation

Silencer and Inlet Collar

Plenum Silencer (TRB)

Instructions for installing a plenum silencer for TRB units.

Abrasion-Resistant Inlet Collar

Installing a collar to protect the unit inlet from abrasive dust.

Platforms and Ladders Installation

Cold Climate Kit Installation

Safety Vents and Sprinklers

Explosion Vents

Safety precautions and installation of explosion relief vents.

Sprinkler Installation

Steps for installing optional fire suppression sprinkler systems.

Troubleshooting Guide

Service Notes Log

Donaldson Torit Warranty Information

Related product manuals