EasyManua.ls Logo

Doosan D1146T - Page 120

Doosan D1146T
179 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Adjust valve clearance with a feeler
gauge and tighten the fixing nuts to
specified torque.
9.3.28. Rocker arm assembly
Apply lubricating oil to the rocker arm
bush and shaft, and assemble the
intermediate bracket with the rocker arm
(rocker arm assembly) on the cylinder
block using fixing bolts. In tightening the
bolts, it must be done at the specified
value using zigzag method.
Semi-install valve clearance adjusting
bolts onto the rocker arm.
Install the spring, rocker arm, bracket,
rocker arm, spring, washer, and snap
ring in the described sequence.
Install the rocker arm and bracket in the
same direction.
9.3.29. Intake manifold
Put in the new gasket between the
cylinder head and manifold, and
assemble the intake manifold by
tightening the assembling bolts.
- 116 -
EB1M3026
Torque
M10: 4.4kg
.
m
M12: 8.0kg
.
m
ED7OM002
Torque 5.0 kg
.
m
EA8M3007
Valve clearance adjust
ED7OM005

Related product manuals