Adjust valve clearance with a feeler
gauge and tighten the fixing nuts to
specified torque.
9.3.28. Rocker arm assembly
Apply lubricating oil to the rocker arm
bush and shaft, and assemble the
intermediate bracket with the rocker arm
(rocker arm assembly) on the cylinder
block using fixing bolts. In tightening the
bolts, it must be done at the specified
value using zigzag method.
Semi-install valve clearance adjusting
bolts onto the rocker arm.
Install the spring, rocker arm, bracket,
rocker arm, spring, washer, and snap
ring in the described sequence.
Install the rocker arm and bracket in the
same direction.
9.3.29. Intake manifold
Put in the new gasket between the
cylinder head and manifold, and
assemble the intake manifold by
tightening the assembling bolts.
- 116 -
EB1M3026
Torque
M10: 4.4kg
.
m
M12: 8.0kg
.
m
ED7OM002
Torque 5.0 kg
.
m
EA8M3007
Valve clearance adjust
ED7OM005

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan PU086T and is the answer not in the manual?

Doosan PU086T Specifications

General IconGeneral
BrandDoosan
ModelPU086T
CategoryEngine
LanguageEnglish