EasyManuals Logo

Doosan PU086T User Manual

Doosan PU086T
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #159 background imageLoading...
Page #159 background image
6) Adjustment
the cap nut and assemble a nozzle to
a nozzle tester.
With the adjusting screw loosened,
operate the nozzle 2 ~ 3 times to
bleed it.
Operate the nozzle tester lever at the
specified rate.
Adjust the injection pressure to the
standard pressure using the adjusting
screw.
After adjusting the injection pressure,
tighten the cap nut to specified torque.
Re-check the injection pressure and
see if the spray pattern is normal.
Spray pattern should be uniform and
free of spattering.
7) Testing
With the nozzle assembled to a nozzle
tester and specified pressure applied,
check the nozzle for fuel leakage.
- 155 -
EFM2056I
EFM2057I
AbnormalNormal Abnormal
EAMC022I
Engine Model D1146/PU086 D1146T/PU086T P086TI
Opening pressure 214 kg/cm
2
214 kg/cm
2
214 kg/cm
2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan PU086T and is the answer not in the manual?

Doosan PU086T Specifications

General IconGeneral
BrandDoosan
ModelPU086T
CategoryEngine
LanguageEnglish

Related product manuals