Unpacking and checking delivery Technical Manual
54 V28 - 08/2019Electronic safe lock
13 Unpacking and checking delivery
13.1 Checks before installation
Requirements:
• Unpack the delivery.
• Make sure that the content is complete.
Make sure that the delivery includes:
• Input unit
• Lock
• Connecting cable
• Plastic bag with installation material
• 3 professional alkaline batteries, industrial by DURACELL®
• Instruction leaflet with further information and reference to the website
Make sure that the optional eBox delivery includes:
• eBox
• Connecting cable
• A label with eBox pin assignment
• Plastic bag with installation material
Make sure that the optional computer software packages include:
• AS280-INSW: USB cable, 1 installation dongle (red), 1 instruction page
• AS284-USBW: USB cable, 1 operator dongle (blue), 1 instruction page
• AS284-NETW: USB cable, 2 administrator dongles (orange), 2 operator dongles (blue), 1
instruction page