EasyManua.ls Logo

Dormakaba SAFLOK MT User Manual

Dormakaba SAFLOK MT
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SAFLOK MT
Installation Instructions
All parts needed to install your SAFLOK MT are included with each unit.
Check to make sure all parts are accounted for before you begin installation.
Do not substitute any of the parts, as it can result in poor performance of your lock.
A60580,
SPINDLE ASSEMBLY
A22230,
ROTATION LIMITER
A20650,
CAM PRIVACY
A27200,
8 EA. SCREW END CAP
M2.9 X 1
A22240, PLATE BACKING, UPPER
A24120, CHASSIS INNER DIE CAST
A23010,
2 EA. END CAP-INNER STANDARD
A28110,
BATTERY PACK
A27010,
4 EA. SCREW TRIM MOUNTING
M5 X 0.8
A22010-L-COLOR,
ESCUTCHEON, I/S STANDARD
A22020-L-COLOR,
ESCUTCHEON, I/S ADB
A27000,
2 EA. SCREW COVER
MOUNTING M4 X 0.7
51540-COLOR,
THUMB-TURN
A26030,
SPRING, BATTERY
A27030, 3 EA.
SCREW PCB M2.9 X 1
A23220,
BUSHING-INNER
A22290,
PLATE BACKING, LOWER
A27060,
2 EA. RETAINING RING, LEVER
A28520,
POTTED PCB
A24000, 2 EA. LEVER-TROY
A24010, 2 EA. LEVER-CONTINENTAL
A24020, 2 EA. LEVER-TUBULAR
A24030, 1 EA. LEVER-VINTAGE RH
A24040, 1 EA. LEVER-VINTAGE LH
A24050, 2 EA. LEVER-ARC
A24090, 2EA. LEVER-GALA
54450,
PUSH WASHER
STANDARD, 29900
ADB, 54460
WAVE WASHER
A20490
SPINDLE
ASSEMBLY
A26010, SPRING LEVER RETURN
Interior
Assembly
A22270,
BACK PLATE
A20480,
CARD READER ASSEMBLY
(RIBBON NOT SHOWN)
A20500,
CHASSIS OUTER ASSEMBLY
A23000,
2 EA. END CAP-OUTER
STANDARD
A22000-L-COLOR,
ESCUTCHEON,
O/S KEY OVERRIDE
A25020,
BUSHING-BRASS
A23210,
BUSHING-OUTER
A27070,
RETAINING RING, BEARING
A26010,
2 EA. SPRING, LEVER RETURN
A60580,
SPINDLE
ASSEMBLY
A27060,
RETAINING RING, LEVER
A22230,
ROTATION LIMITER
Exterior
Assembly
Question and Answer IconNeed help?

Do you have a question about the Dormakaba SAFLOK MT and is the answer not in the manual?

Dormakaba SAFLOK MT Specifications

General IconGeneral
BrandDormakaba
Lock TypeMortise
Backset2-3/4 inches
Deadbolt1-inch throw
HandingReversible
FinishVaries by model (e.g., Brass, Chrome)

Summary

Door Preparation

New Construction Door Prep

Guidance for preparing doors for new construction installations using the SAFLOK MT Door Prep. Template.

Retrofit Door Preparation

Steps for retrofitting existing hardware, ensuring proper door edge prep and drilling.

Mortise Case and Lock Trim Installation

Mortise Case Installation

Instructions for inserting the mortise case into the door edge, routing wires, and securing the front plate.

Lock Trim Alignment

Details on aligning outside and inside trim assemblies using alignment pins and ensuring proper door clearance.

Back Plate and Wire Routing

Instructions for attaching the back plate, feeding ribbon cables, and routing motor/battery wires.

Switch Cam and Inside Escutcheon

Guidance on setting the switch cam position and installing the inside escutcheon with dead bolt.

Lock Functionality Testing

Test Lock Operation

Procedure for testing lock operation with a construction zone keycard and interpreting indicator lights.

Troubleshooting Communication Errors

Table detailing common lock communication errors and their electronic function descriptions.

Door Unit Inspection Criteria

Appearance Inspection

Criteria for evaluating the finish and mounting straightness of lock components.

Lock Functionality Checks

Tests for smooth operation of knobs, levers, dead bolts, and latches.

Electronics and Keycard Checks

Evaluation of keycard insertion, light indicators, and dead bolt release functions.

Door Functionality Checks

Verification of door closing, latching, and dead bolt extension without interference.

Related product manuals