EasyManua.ls Logo

DVP LC.2 - 7 How to Return the Pump; 8 Dismantling

DVP LC.2
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating and Maintenance Instructions
EN
LC.2 – LC.4 – LB.5 – LB.6 – LB.8 – LC.12 – LC.20
17
8702036 – 12/04/2016 – R.7 www.dvp.it
7 HOW TO RETURN THE PUMP
The product may only be returned after prior agreement with the supplier, who will provide the authorisation number
that must accompany the material delivered and should be duly complete in its entirety.
8 DISMANTLING
Demolition of the pump must be performed by authorised technicians.
Metal parts can be disposed of as scrap metal.
All materials deriving from demolition must be disposed of according to regulations in the country where the pump
will be demolished.
HAZARD
Disposal operations involve risks of cutting, shavings protection, entanglement, contact with
moving parts and contact with chemicals. Operators should use the appropriate personal
protective equipment.

Table of Contents

Related product manuals