Installation, Operation and Service Manual LKP Series
© 2020 DynAmp, LLC Page 33
041736 N
7. RELATED TECHNICAL BULLETINS
The following is a list of available technical bulletins that contain relevant information in
regards to high current measurements and the use of LKP systems. The technical
bulletins are available upon request from DynAmp, LLC. Always consult the factory for a
list of the latest technical bulletins.
Table 7.1
Technical Bulletin List
9908 External Fields Resolving External Magnetic Field Errors (replaces
9907 LKP/ LKB LKP and LKB Sensor Mounting Guidelines and
9905 LKP/ LKB Recommended Calibration Intervals for LKP or LKB High
9904 Diagnostics Self Diagnostics for DynAmp High Current Measurement
systems (Accuracy Diagnostics)
987 LKP/ LKB Ferromagnetic Materials near LKP or LKB High Current
749 Bus Analysis Computer Analysis of Measuring Head Locations In High
Current Measurement systems
748 LKP/ LKB Guidelines for locations of LKP or LKB High Current
Systems Measuring Heads on Busses
747 kWH Volt-hours times Ampere-Hours is NOT equal to Watt-
941 Bus Analysis Data required for Bus Analysis of High Current