EasyManua.ls Logo

Dynapac CA 152 User Manual

Dynapac CA 152
11 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DYNAPAC
CA 150/152
WORKSHOP MANUAL
W1080EN1
CONVERTING DRUM
STD/D TO P/PD
Box 504, SE-371 23 Karlskrona, Sweden
Phone: +46 455 306000, Fax: +46 455 306030
www.dynapac.com
Question and Answer IconNeed help?

Do you have a question about the Dynapac CA 152 and is the answer not in the manual?

Dynapac CA 152 Specifications

General IconGeneral
BrandDynapac
ModelCA 152
CategoryConstruction Equipment
LanguageEnglish

Summary

FITTING

Preparation and Initial Drilling

Workshop setup, dismantling the transverse beam, and drilling holes for the first pad half.

Bolt Installation and Drum Positioning

Fitting M16 bolts and positioning the drum for the second pad half installation.

Securing Pad Halves and Final Bolt Fitting

Ensuring clearance, lubricating, fitting, and tightening pad half bolts.

PD Scraper and Shim Installation

Attaching the PD scraper and positioning shims between scraper teeth and pads.

Scraper Adjustment and Post-Installation Checks

Adjusting scraper clearance, torque-tightening bolts, and post-operation retightening.

DISMANTLING

Marking Pad Halves for Removal

Marking the pad halves to ensure correct reassembly after removal.

DRAWING 38 53 45

TOOLS, HEXAGONAL SOCKET WRENCH 38 55 04

Related product manuals