EasyManuals Logo

Dynasty Spas excalibur Series User Manual

Dynasty Spas excalibur Series
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Priming Pump For Electric Packs
Turn off power at the breaker
It is important to make sure that all of the air is out of the equipment pack
before operating. To do this follow procedures below:
The Power pack system is located under the wood skirt. The equipment
can be serviced by simply opening the doors.
Set thermostat, located on top side control panel to desired temperature, and
continue heating until desired temperature has been reached. Depending
on equipment, this will normally take 8 to 10 hours.
Make sure the gate valves are open
Fill the spa with water to fill line, or just below neck jets
Turn the power on at the breaker
Start the pump on Hi-Speed and water will start circulating within
one to two minutes. (The pump is self-priming). If water does not circulate,
turn off the power and make sure all gate valves are open if so equipped.
Restart the pump. Within one to two minutes, it should be primed
Open Air bleed screw, just beside skimmer, to prime pumps.
After bubbles stop, tighten off bleed screw.
General Pre-Operation Instructions
WARNING: Do not run spa with gate valves closed or run pump with
no water circulating in spa for long periods. This could damage
the spa equipment.
Corona Discharge
Equipment Pack
Gate Valves
Fiber Optic
Illuminator
Flow Thru
Heater
Unions
2 Speed
High Performance
Pump
2 Speed
High Performance
Pump
Location of
(3rd)2 Speed
High Performance
Pump (Optional)
11

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dynasty Spas excalibur Series and is the answer not in the manual?

Dynasty Spas excalibur Series Specifications

General IconGeneral
BrandDynasty Spas
Modelexcalibur Series
CategoryController
LanguageEnglish