DL5.0C User Manual
©Dyness reserves the copyright of this document
Unpacking Inspection
• When the equipment arrives at the installation site, loading and unloading should
be carried out according to the rules and regulations, to prevent from being exposed
to sun and rain.
• Before unpacking, the total number of packages shall be indicated according to the
shipping list attached to each package, and the case shall be checked for good
condition.
• In the process of unpacking, handle with care and protect the surface coating of the
object.
• Open the package, the installation personnel should read the technical documents,
verify the list, according to the configuration table and packing list, ensure objects
are complete and intact, if the internal packing is damaged, should be examined and
recorded in detail.
Table 3-1 Packing List
Communication
parallel cable
Black
/L500mm/Double
RJ45 plug
Communication
cable-to inverter
Black
/L2000mm /Double
RJ45 plug