DL5.0C User Manual
©Dyness reserves the copyright of this document
Engineering coordination
• Attention should be paid to the following items before construction:
• Power line specification.
• The power line specification shall meet the requirements of maximum discharge
current for each product.
• Mounting space and bearing capacity.
• Make sure that the battery has enough room to install, and that the brackets have
enough load capacity.
• Wiring.
• Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
Equipment Installation
Table 3-2 Installation steps
Step 1 Installation preparation
Confirm that the ON/OFF switch on the front panel of DL5.0C unit is in the “OFF” state to
ensure no live operation.
Step 2 Mechanical installation
1. Battery placement position determination
2. Battery module installation
Step 3 Electrical installation
1. Ground cable installation
2. Battery module parallel cable installation