DL5.0C User Manual
©Dyness reserves the copyright of this document
16
Engineering coordination
Attention should be paid to the following items before construction:
Power line specification.
The power line specification shall meet the requirements of maximum discharge
current for each product.
Mounting space and bearing capacity.
Make sure that the battery has enough room to install, and that the brackets have
enough load capacity.
Wiring.
Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
Equipment Installation
Table 3-2 Installation steps
Step 1 Installation preparation
Confirm that the ON/OFF switch on the front panel of DL5.0C unit is in the “OFF” state to
ensure no live operation.
Step 2 Mechanical installation
1. Battery placement position determination
2. Battery module installation
Step 3 Electrical installation
1. Ground cable installation
2. Battery module parallel cable installation
cardboard
Positioning
cardboard
1
Battery bracket
Battery bracket
1
Fixing bracket
Fixing bracket
1
OFF
Grounding