EasyManua.ls Logo

Dynex DX-MLET21 - Secure Wall Plate to Wood Studs; Drill Pilot Holes in Studs; Attach Wall Plate with Lag Bolts; Caution: Do Not Over-tighten Lag Bolts

Dynex DX-MLET21
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
DX-MLET21
www.dynexproducts.com
3 Drill four pilot holes through the template to a depth of 2-3/4 in. (70 mm) using a 7/32 in. (5.5 mm) diameter drill bit,
then remove the template.
4 Align the wall plate with the pilot holes, insert the lag bolts through the lag bolt washers, then through the holes in the
wall plate. Make sure that the wall plate is level. Tighten the lag bolts with a socket wrench only until they are firm
against the wall plate.
Important: Make sure that you drill into the center of the studs.
CAUTION: DO NOT over-tighten the lag bolts.
2-3/4 in.
(70 mm)
7/32 in.
(5.5 mm)

Related product manuals