Do you have a question about the EarthWay EV-N-SPRED 2150 and is the answer not in the manual?
Guidance on achieving even spread, speed, fertilizer types, and cleaning for optimal performance.
Remove and identify all loose parts from the shipping carton before beginning assembly.
Position the hopper upside down and install the frame using specified flat head Phillips screws.
Install impeller onto pinion shaft and then install the gearbox into the hopper bottom.
Install lower handles and frame braces onto the axle and frame, ensuring proper alignment.
Slide axle bushings, install drive and coast wheels onto the axle using cotter pins.
Attach upper handles, handle spacer, and gauge & lever assembly to the handle shaft.
Insert pivot rod into the shut off plate and then into the pivot and bracket assembly.
Install handle shaft to lower handles and control rod to the control rod nut.
Connect the control rod's flattened end to the lever on the gauge assembly.
Calibrate flow control by setting lever to '30' and tightening nuts against the pivot bracket.
Insert agitator onto the pinion shaft inside the hopper, noting the flat side position.
Familiarize with operation, obtain settings, move stop bolt, and push spreader forward.
Push lever forward to close flow holes, empty material, and wash spreader.
EARTHWAY guarantees product free of defects for 90-days from sale; repair or replacement offered.
No warranty against corrosion; clean and dry spreader thoroughly after each use.
Provide Model Number, Part Number, and Part Description when ordering spare parts.
Detailed list of all parts with key numbers, part numbers, and descriptions for the Model 2150 spreader.